Main Article Content
Article Details
References
- [1] T. Konnery, “Strategi Pencapaian Pemanfaatan Pembangkit Listrik Tenaga Surya (PLTS) Di Indonesia Sampai Tahun 2025,” Tesis. Pascasarjana Universitas Indonesia, 2011.
- [2] R. Ikhsan, I. D. Sara, and R. S. Lubis, “Study Kasus Kelayakan Penerapan Sistem Hybrid Building Applied Photovoltaics (BAPV)- PLN pada Atap Gedung Politeknik Aceh,” Rekayasa Elektrika, vol. 13, No 1, pp. 48-56, April 2017.
- [3] “Kondisi Kelistrikan Nasional Saat Ini.”[Online].Available: http://www2.esdm.go.id/berita/39-listrik/7169-kondisi-kelistrikannasional saat-ini.html. [Accessed: 25- Nov-2016].
- [4] I. Kumara, W. Ariastina, I. Sukerayasa, and I. Giriantari, “On the potential and progress of renewable electricity generation in Bali,” in Information Technology and Electrical Engineering (ICITEE), 2014 6th International Conference on, 2014, pp. 1–6.
- [5] Direktorat Jenderal Energi Baru Terbarukan. 2021. “PLTS Rooftop Untuk Gedung Perkantoran”. https://ebtke.esdm.go.id/post/2015/03/1 /800/plts.rooftop.untuk.gedung.perkantoran , Diakses pada 28 Oktober 2021.
- [6] Wijdan Kelistrikan. 2021. “Komponen apa saja yang harus adapada PLTS panel surya? berikut ini uraiannya”. https://www.kelistrikanku.com/2017/01/komp onen-bagian-panelsurya.html , Diakses pada 29 Oktober 2021.